Tuesday, August 21, 2012

Windows and Plaster

The bay windows of the Delaney House

What a difference a day makes.

As you can see, the Delaney House now has more windows. Dan and the crew worked to get all the windows in on the first floor. It's a pretty dramatic change - the house really looks to be coming together.

The west wall of the Delaney House


The view out the bay window in the new first floor bedroom


The new kitchen, with a bit more work to do


The new living room, with windows (the outside door will be to the right)


And the Cheney Cottage has the first plaster on the walls. The back bedroom over the dining room now has solid walls - the holes for all the beams have been filled with plaster, and the finish coat of plaster is already up on some of the walls. Compare this to the recent post that showed the insulation in the sloping ceiling!
Plaster on the ceiling and walls, with the wooden corner bead exposed

Monday, August 20, 2012

Happenings

The front stairs of the Cheney Cottage - with the concrete walkway

Lots of updates:

Dan and his crew have been working to get things organized on the site. In the Cheney Cottage, they removed the stored windows and doors, and put them all in the Delaney House. They also organized piles of wood, and moved all the junk out. The place is a lot more spacious with all that stuff moved out.

The living room in the Cheney Cottage

The dining room

They've also been helping get the Cheney Cottage ready for the plastering. They have been installing the rigid insulation in the sloping ceiling (where the ceiling is basically the back side of the roof, with no attic space above it). This should help keep the Cheney Cottage warmer in winter, and especially help by stopping it from heating up so much upstairs in the summer.

The back bedroom of the Cheney Cottage - insulation in place

The plasterer is in the Cheney Cottage. Tom and I stripped the wallpaper in one of the back bedrooms, and Jesus and Hector stripped the other two today. The plasterer is going to be replastering the three bedrooms, the upstairs hallway, the stairwell, and the living room and dining room. The kitchen, downstairs bathroom and laundry room have to wait until the plumbing inspection happens.

Ray Triola and his crew have been working on installing the drain waste vent system for the plumbing, and it is almost done.

We also have started installing the heating system - the first of the colorful red and white pex pipes are in place, running up inside the downstairs bathroom wall to the back bedrooms upstairs. These pipes will soon bring hot water to and from the radiators in those rooms.

The first heating lines (insulation not yet installed)

Out back, lots of clean up has been going on. The scaffold on the west side has been removed, and the piles of debris taken away, so it is possible to get to the back of the Delaney House with a bobcat (to start digging footing drains and clearing debris in the backyard). The house has been organized, and materials put into organized piles.

This week, the plastering of the Cheney Cottage continues, plus the installation of all the windows in the Delaney House. The crew will also work on prepping the old siding to be installed on the new first floor of the Delaney House, and install the watertable between the first and second floors. The goal is to make the Delaney House weatherproof in the next couple weeks, before any rains arrive on the site.

Upcoming activities at the Cheney Cottage:
  • Painting (finishing the exterior)
  • Installing the supply plumbing
  • Installing the heating system
  • Installing kitchen counters
  • Installing gas lines
  • Finishing the woodwork
  • Refinishing the floors

In the Delaney House:
  • Building the stairs (connecting the two floors at long last)
  • Finishing the framing
  • Finishing upstairs bathrooms
  • Installing the heating system
  • Wiring and plumbing

Outside:
  • Installing the driveway (on the site - the curb cut is done, along with the new sidewalk)
  • Running electrical and gas to the Delaney House
  • Walkways to the Delaney House
  • Patio outside the Delaney House back door
  • Landscaping
A lot to do, but suddenly it's all happening, and seems manageable.

Saturday, August 11, 2012

Watch Our Dust

We've changed crews working on 62nd Street, and things are really starting to happen. Over the next couple months, a lot will be taking place.

Dan Tobin, who we have known for many years, is now actually living in the Cheney Cottage, taking care of the place and overseeing the work that's going on. Dan and his brother Tim have taken charge of the construction, and they'll be working primarily in the Delaney House. In the next couple weeks, they'll get the windows installed, put up the siding, build the stairs, and really start flying on the inside. The Delaney House is going to start looking like a finished place (at least from the outside) very soon.

Dan has helped manage the first project: installing the driveway and the walkway to the Cheney Cottage. The concrete is done (we used 5 yards of concrete) and it looks sharp! By tomorrow, when we can start walking on it, we'll be able to walk right up to the front steps, without having a major step to get up to the porch.
The new walkway to the Cheney Cottage

In the Cheney Cottage, the plumber is starting on Monday installing the drain waste and vent lines. Next weekend, Tom and I will install the pipes for the upstairs radiators, and then on the 20th the plasterer will start. Soon the Cheney Cottage will have finished walls!

We're finalizing the details with Bill Rayno for the heating systems, but we should have a working heating system in both houses before long. Dan and Tim have secured the Delaney House, so we can put things in there and not worry about them being stolen. So the boilers for both houses will be installed, then the underfloor heating and radiators.

And Dale will be back the week of the 20th to finish the paint job on the front house, and to start planning the paint for the back.

The whole project is on track to wrap up some time in November. We hope to get the Cheney Cottage rented in early September, and the Delaney House will follow soon after. Stay tuned, things will be moving fast!

Tuesday, July 31, 2012

Blind Guy with Sewing Machine


Of all the power tools I have used since losing my vision, the one that is the most difficult and frustrating is Ann Nathan's old Singer sewing machine.

I know that Tom and I may be projecting a somewhat butch attitude in this project. I've written about sweating pipes, using various power tools, doing wiring, stripping paint. It all sounds so...macho.

But I've also been working on making curtains for the Cheney Cottage's living room. And using a sewing machine has got to be the toughest of all the tools to use. The chop saw? The table saw? The router? Piece of cake.

But the sewing machine is a major pain in the ass to use, particularly for a blind guy. It's just so incredibly complicated.

Winding the bobbin is pretty simple, although I do have a hard time getting the end of the thread through the hole in the bobbin. But generally, I can do that, and the bobbin gets wound.

But then I have to thread the machine, and that takes time. The thread has to be put through several very small spaces, the last (and most difficult) of which is the eye of the needle.

Every time I talk about this, people tell me "Dmitri, there is an adaptive technology for threading needles" I know, I know. I've tried it. It doesn't really work all that well, nor does it make it any easier.

Fortunately, when my father died, one of the things I inherited was his super strength magnification goggles. I put them on, and then, if I get the light and the angle JUST right, I can see the eye of the needle. For a second or two.

But that gives me enough time to line up the thread, and then I try to push it through. Often, it takes 15 or 20 minutes to do this, but eventually, I get the thread to start through the eye. I keep a pair of needle nose pliers nearby, so as soon as I see the thread peeking through, I grab it with the needle nose pliers and pull it through.

All this wouldn't be so bad if I didn't have to do it SO MANY TIMES. The thread breaks. The bobbin runs out. The spool runs out. I end up doing it many many times.

The dreaded sewing machine - goggles and pliers to left

I've also learned not to use pins on the hems. Pins are problematic: first, if I drop one, I never seem to find it (unless I'm barefoot). And getting the pins in properly requires additional use of the goggles, and my eyes can't hack it. So I take the fabric and iron the hems, then run them through the machine that way.

On top of all this, I am hardly talented with the damn thing. My hems are generally even, but if you look at the stitching, it zigs and zags somewhat. Since I can't see it myself unless I am right up against it, I figure no one else can either. (If you pass by the Cheney Cottage and notice that the stitching on the front curtains looks crappy, please keep that information to yourself.)

In the Cheney Cottage living room, there are 9 windows that need curtains - the 5 windows in the bay, the window in the door, and the three windows on the west wall. So since I'm making pairs, that is 18 panels. Daunting.

But I'm almost done. I've completed 16 of the panels. Two more to go, and the curtains are finished.

This weekend, Claire stopped by and suggested that I should be buying curtains from Ikea. She's right, of course, except that no one has curtains in the sizes i need for these windows. And after all the woodwork we've stripped in that living room, I want the curtains to look good, and to cover as little of the woodwork as possible. The curtains I've made for the front windows cover the glass but leave the woodwork fully exposed.

Tonight, I was going to finish the last two curtains. I have a summer cold, so I haven't been up for it for a couple days, but I thought I could manage it. Then I looked at the sewing machine, ready to use, and saw that the spool of thread is running out. So I'll have to re-thread the machine at least one more time. And of course, that's assuming that nothing goes awry during these last few hems.

So I'm taking Claire's advice, and the rest of the windows will have pre-made curtains. They'll go in faster, and I won't strain my eyes like I have on these ones. But I'm happy with how the curtains are looking. I might even make some matching pillows for the window seat. I think Mae Cheney would be proud.

Sunday, July 29, 2012

The First Window

The first of the new Kolbe windows is finally installed on the first floor of the Delaney House.

The kitchen window on the back of the Delaney House

This window took a long time to install, because the rough opening for it was wrong. The opening was supposed to be 24" wide by 54" high, but for some reaosn, it was 34 1/2" wide and 66" high. So the first step was to fix the rough opening.

Next, we installed bituthane on the ledge below the window, to keep water out, and added flashing to protect the wood around the window. Then the window was caulked, and it was supposed to slide gently into place.

After reducing the size of the opening, the window fit, but it was very tight. So we had to adjust it several times, which is a major pain. But finally, we got it right, nailed it in place, and the window was in.
Looking out the kitchen window

One down, 11 to go.

Friday, July 27, 2012

The Front Yard

The front yard of the Cheney Cottage is shaping up. In the past week, we've made two major changes to it.

First, Hilary used the bobcat to grade the yard. It had been pretty uneven, with piles of dirt and debris. We have been cleaning up the site, making piles a lot of the broken concrete and bricks. Hilary loaded those piles into a truck to haul them away, and then he used the bobcat to fill in some of the trenches and make the front yard relatively level.
The Cheney Cottage, with the power pole out of the front yard

Then today, the company came to remove the temporary power pole. With the power hooked up to the house, the Cheney Cottage finally does not have the ugly yellow power pole in the front yard.

But as the front yard becomes more finished, the side yard has been torn apart. Hilary also dug the trenches for the water and sewer lines. The plumbers have already been in to hook up the sewer laterals, and on Monday we will have them inspected. Assuming they pass, we'll then get the new supply lines run on Tuesday, and then we can fill in the trenches.
Running the new sewer laterals to both houses (Cheney to the right)

Yesterday, Tom and I met with the concrete guy, and if all goes well, the new sidewalk, the steps and the front walkway for the Cheney Cottage will be poured next Saturday.

There are more trenches to dig: for the electric line back from the Cheney Cottage to the Delaney House, and for the gas line back to the Delaney House. But hose little trenches pale in comparison to what's been done. When the plumbing trenches are filled in, we can also start working on putting in the driveway. And landscaping can actually begin in front of BOTH houses.

This weekend: more of the same. We still haven't worked on installing windows in the Delaney House, and we have to get them out of the Cheney Cottage. So that is probably next on the list, in addition to working on plumbing.

Tuesday, July 24, 2012

Cheney at Night

The window at the landing, and the WC window, with electric lights on inside

The power was turned on at the Cheney Cottage, and now there are lights on inside the house. Yet another milestone. PG&E came out, and disconnected the power from our temporary power pole (which is being removed from the front yard on Friday - hooray!). Then they ran wires to the power drop that Jeff Williams installed, and installed a meter in the box on the side of the house.

Then one by one, I turned on the circuits - half expecting the fuses to blow, or the house to explode in front of me. But everything worked, and the power began flowing through the miles of romex that we snaked through the walls to the various outlets, switches and lights.
The front porch, after dark


The back porch light and the dining room window

After a somewhat quiet month, spent making plans and trying to figure out exact budgets, we're back on track to getting the Cheney Cottage done and making significant progress on the Delaney House. So Hilary is on 62nd Street this week, digging the trenches for the various services that go underground. We're hoping to get water to the Cheney Cottage, and drain pipe laid to take away the waste water.

The upstairs bathroom, with the lights on

We've also put up some curtains in the front windows, which makes the house seem much more lived in. Every step moves the Cheney Cottage closer to being completed, to joining its new neighbors on 62nd Street.
The Cheney Cottage with curtains. The power pole will disappear on Friday.

I've been re-reading some of the early blog entries, and marveling at our naivete. I guess it's really the only way we could ever actually address projects like this, but did we really think, back in February of 2010, when we were preparing to cut the Cheney Cottage in half, that we would finish both houses by September? Back then, we still thought the City would expedite our permits and we'd be able to move the house directly from the campus to 62nd Street.

I think it's the only way we get through these things. When we bought the house next door ("the Old Magahey place") on Fulton Street, it was infested with rats, and her cats had...well, they'd left their mark. Everywhere. The house needed everything except a roof: new wiring and plumbing, a heating system, every surface refinished, new foundation, new porches, floor joists and beams replaced. Our friends were horrified by this undertaking, and most refused to even walk in the door (the smell was pretty overpowering).

The first day we actually owned the place, we made a video - the "Before" video - and I did my best Jackie Kennedy imitation as we walked through the house ("As we walk down the hall, will you point out the rat droppings?" "Well there's this one, and this one, and this great big one, and this teeny tiny one....") But we never actually sat down and watched it.

When the house was done, we finally watched the video. We couldnt' believe it. What were we thinking?!? The house was such a wreck, and we took this on? And spent our every waking hour in there?!? Suddenly we knew why our kids, our friends and our neighbors all thought we were nuts.

So it goes on 62nd Street. Maybe my vision enables me NOT to see everything that's going on, and Tom has blindness by proxy. But somehow, we keep our enthusiasm and expectations high, and we put our heads down and plow on through. The results ultimately speak for themselves. But we get pretty tired in the process.

More soon.